References

Since 1997, Mikrovai has been manufacturing and installing micropiles and ground anchors using the injection drilling method. With our long-standing experience, we offer services both in Estonia and Scandinavia.

We provide the following services: installation of injection-drill piles, impact-driven RR piles, impact-drill RD piles, bored piles, retaining walls, and ground anchors. During our years of operation, we have installed piles and anchors for more than 2,000 different sites. Below, you will see some examples of completed projects.

Operating since 1997

Arvo Pärt Centre

Installation of CFA bored piles.

2017 Laulasmaa

Customer: Ehitustrust AS | Source: AS Ehitustrust

Riia Quarter

Installation of CFA bored piles.

2020 Tartu

Customer: Domum OÜ | Source: riiakvartal.ee

Võru wastewater treatment plant

Installation of CFA bored piles.

2021 Võru

Customer: RVT Ehitus OÜ | Source: Võru Vesi AS

Apartment buildings at Kotermaa 11 and 13

Installation of CFA bored piles.

2021 Tallinn

Customer: Astlanda Ehitus OÜ | Source: City24.ee

The Tallinn Music and Ballet School

Installation of ground anchors.

2020 Tallinn

Customer: Merko Ehitus Eesti AS

Nysäter Wind Farm

Anchoring wind turbines with wire rope anchors.

2020 Rootsi

Customer: Nordecon Betoon OÜ

Baltic Station Market

Construction of the retaining wall of a construction pit and anchoring of the floor slab.

2016 Tallinn

Customer: Mapri Ehitus OÜ | Source: Mapri Ehitus OÜ

Tallinn Tondiraba Ice Rink

Anchoring works

2013 Tallinn

Customer: Merko Ehitus Eesti AS | Source: Tondiraba Jäähall

Tunnel of the Järvevana junction

Anchoring works for the bottom plate of the Ülemiste junction 2.2.

2012 Tallinn

Customer: Merko Ehitus AS | Source: Merko Ehitus AS

Grimsta Stadium

Installation of impact-drilled RD pipe piles.

2015 Stockholm

Customer: Bauest AB | Source: Bauest AB

Kanalplan Stadium

Piling for the buildings of Kanalplan Stadium.

2016 Stockholm

Customer: Bauest AB | Source: Bauest AB

Ülenurme residential area

Installation of impact-driven RR piles

2017 Villa 15, Tartu

Customer: Farmada Grupp OÜ

TYKS T2 Turku Hospital

Piling work at TYKS T2 Turku Hospital in Finland.

2009

Customer: Suomen Teräspaalutus Oy

Staircase of Põhjakonn

Installation of injection-drilled piles.

2017 Viimsi

Customer: OÜ Tilts Eesti Filiaal | Source: Viimsi vald

Purtse wind farm

Installation of injection-drilled piles.

2017 Sonda, Ida-Virumaal

Customer: Kuressaare Ehitus OÜ | Source: Rauno Volmar

Ambassador

Installation of injection-drilled piles.

2020 Reimani 8, Tallinn

Customer: OÜ Metropoli Ehitus | Source: endover.ee

LIDL store building

Installation of injection-drilled piles.

2019 Tähesaju tee 4/6, Tallinn

Customer: Mapri Ehitus OÜ | Source: Fresh-Est OÜ

Noblessner foundry

Installation of injection-drilled piles.

2018 Peetri 10, Tallinn

Customer: Oma Ehitaja | Source: Martin Dremljuga, BLRT Grupp

Fat Margaret

Installation of retaining walls.

2018 Tallinn

Customer: Acres OÜ | Source: Meremuuseum

Apartment building

Installation of a retaining wall made of CFA piles.

2016 Kopli 16, Tallinn

Customer: KMG Inseneriehitus AS | Source: Lumi Capital